Skip to main content
Laravel takeovers 6 min read

Taking over a Laravel application: a business handover checklist

Taking over a Laravel application? Check access, keys, test copies and handover proof before a new team accepts responsibility for your business software.

A Laravel project takeover should prove that a new team can run the system. A copy of the code is only one part of that handover.

You also need access to the services it uses, a safe test copy and clear support duties. Set those checks before the old team leaves. Keep open questions in a shared record. Silence is not approval.

A handover connects source code, service access and proof that tasks and recovery work.
01 / The handover map. Code, access and working proof belong in the same review.

What should you agree before changing Laravel developer?

Name one person in the business who can accept the handover. Give the incoming team a clear scope for its review. The outgoing supplier should know what evidence to provide and where to put it.

Keep the first review separate from a request for new features. First, find out what exists and who can run it. Then decide what needs fixing. A fault found during handover does not, by itself, explain who caused it.

Write down the tasks the application must support. Our guide to writing a software specification can help turn vague needs into checks. For an existing application, start with work staff already do.

Do you control the services the application needs?

Ask who controls the domain, hosting, code store and billing accounts. The code store, often called a repository, should include the change history. Check that the supplied code matches the version on the live site.

List outside services too. These may send email, take payments, store files or connect accounts software. Record the account owner and how the new team gets approved access. An old developer's personal login is a gap to resolve.

  • Confirm who can renew the domain and hosting.
  • Check access to the code, release records and build files.
  • List paid packages, licence terms and renewal owners.
  • Record where uploads, backups and logs are held.
  • Name who can grant or remove each person's access.
  • Agree a secure route for secrets, with no passwords in the handover sheet.

Access and ownership are different questions. Check the contract for rights to custom code and licensed parts. Do not assume that paying for a project means owning every package it uses.

How should the team handle keys and passwords?

Give named people the access they need through a secure process. Avoid shared logins where the service offers user accounts. The OWASP secrets guidance covers controlled access, recovery and key changes.

A Laravel application key needs special care. It helps protect encrypted data. Laravel's encryption guide explains that changing it can end sessions and prevent access to old encrypted data. Do not generate a new live key just because the developer changes.

Ask the incoming team to plan each key change. It should check the installed Laravel version and what uses that key. Remove the old team's access once the agreed transfer is complete. Keep evidence that the business still has a safe recovery route.

Can the new team test without touching live work?

The team should prove it can run the supplied code in a separate test setup. A code folder that opens on one developer's laptop is weak handover evidence.

Use made-up or safely masked records. Before starting the copy, block its routes to real customers and services. That includes email, payments and work sent to other systems. Background jobs and timed tasks must stay isolated too.

Ask the team to record how it built this copy. Include the PHP and Laravel versions, required packages and setup steps. Check each software version against its own support policy. Laravel support windows and PHP support windows are separate.

Known package checks help, but have limits. A Composer audit can flag known package advisories. A clean result does not prove that custom code is secure.

A closed boundary keeps test records, mail, payments and jobs away from live customers and services.
02 / Keep the copy separate. Block real mail, charges and live jobs before starting a test copy.

Which business tasks must the handover prove?

Choose tasks that would stop work or cause harm if they failed. Test each with the right user role. Include a failed payment, a refused login or a duplicate request where relevant.

Our Country Cover Club project shows how membership, payments and PDF certificates can sit together. A handover check for that kind of system should follow the whole task. A saved payment record alone would not prove that the member received the right certificate.

Ask for proof of work that happens out of sight. Queues hold jobs for later processing. Scheduled tasks run at set times. A page can load while either has stopped. Laravel's queue guide and scheduler guide describe these separate parts.

Request a safe restore test as well. Agree which files and records it must recover. Record what was restored, where it was checked and what remains untested.

Working evidence, named owners and open risks feed a handover review. A person records the decision.
03 / Evidence before acceptance. A tick does not replace proof or a named decision maker.

What should a handover acceptance record contain?

Use one shared sheet with links to the evidence. The rows below are prompts, not proof that your application has passed. Fill in the names and results for your own handover.

Item Evidence to attach Owner to name Unresolved issue to record
Live code Release reference and a working test copy Incoming technical lead Missing code or steps that could not be repeated
Service access Account list and checked access for named users Business account owner Personal accounts, missing rights or unclear billing
Keys and secrets Secure transfer record, without the secret itself Person managing access Unknown key use or access that still needs removal
Core tasks Test results linked to agreed pass rules Business process owner Failed, blocked or untested cases
Recovery Restore test result and the records checked Person responsible for recovery Missing files or data outside the tested backup
Support transfer Start point, incident contact and open fault list Business handover lead Gaps between the old and new support duties

Mark each row as accepted, blocked or accepted with a named exception. Link the exact code version and test date. The business owner should approve each exception and name who will fix it.

Which evidence do you already have?

Tick only the items you can show. Use the gaps as questions for the incoming team. This is not a readiness score.

Mark the evidence held

Your marks stay in this page. Nothing is sent or saved. A person must still review the proof.

What happens after the handover?

Agree who receives alerts and who acts on them. Confirm when the outgoing supplier's duties end. Put open faults into the new team's work list, with business impact and owners.

Keep ongoing website support and maintenance separate from new feature work. If the review finds an ageing codebase, scope legacy software modernisation before choosing a rebuild. A handover review should not assume that replacing the whole system is the answer.

For future bespoke software work, keep the same evidence record up to date. A clear handover should survive the next change of developer too.